Uncategorized
Miami International Airport (MIA), DEFG&H Wraps and Renovations Miami, Florida
DEFG&H Wraps was a design and renovation of the Miami International Airport to enhance the old terminal, provide additional gates, demolish the old hotel, and design a new hotel. Although the construction design was completed, the construction was placed on hold indefinitely. Scope of services included field verification of existing areas to be remodeled, the…
Read MoreMiami International Airport (MIA), North Runway Miami, Florida
North Runway was the construction of a new 8,600-foot air carrier runway including all associated taxiways and circulation roadways on the north side of the Miami International Airport. Scope of services included the design for the replacement of the fire protection utilities, and coordination with existing hangars such as Sonic Aviation and Commercial Jet. This…
Read MoreRandal “DOC” James Racetrack Reconstruction St. Croix, U.S. Virgin Islands
The Randal “Doc” James Racetrack consisted of a new casino with remodeling and upgrades to the existing Racetrack. The scope of services included mechanical, plumbing and fire protection system design for the new casino building and horse racetrack, horse stalls, and ancillary buildings and lighting for the new grandstand.
Read MoreBroward Sheriff’s Office (BSO) Hazmat/TRT/special Operations Fire Rescue Station and Training Tower Broward County, Florida
This project, which is located next to Ft. Lauderdale Hollywood Airport, consists of a four-bay, 16,700 square foot station which features a medical exam and treatment room, commercial kitchen, outdoor barbecue area, command center, and multipurpose community room. Also included is a six-story training tower with a 50-foot apron for staging, and windows and balconies…
Read MoreMiami International Airport (MIA), South Terminal Expansion Miami, Florida
South Terminal Expansion was an expansion of the 900,000 square foot airport terminal with an estimated cost of construction at $1.1 billion. This included complete plumbing and fire protection for a multi-level terminal facility. Scope of services included engineering design of fire protection, plumbing for public restrooms, complex roofing structure, roof drainage piping system with…
Read MoreAbu Dhabi International Airport (AUH) Abu Dhabi, United Arab Emirates (UAE)
Abu Dhabi International Airport consisted of interior renovation, remodeling, and upgrades of the existing terminal that was initially built in 1970. The project had a tight schedule as the client requested completion before the arrival of millions of tourists for the first Formula 1 race in the country. The scope of services included project management…
Read MoreTocumen International Airport (PTY) Panama City, Panama
The Tocumen International Airport project consisted of a new 116,000 square-meters terminal expansion with 20 new gates which included the rehabilitation study of the apron, taxiways, and runways. The scope of work consisted of the preparation of an engineering study to evaluate options for the rehabilitation and/or reconstruction of both Runways 03R-21L & 03L-21R. This…
Read MoreFort Lauderdale International Airport (FLL), Terminal 4 Broward County, Florida
This project was a remodeling and upgrade for Terminal 4 of the Ft. Lauderdale International Airport. Scope of services include the design of HVAC, plumbing, and fire protection systems.
Read MoreSt.Thomas Airport (STT), Cyril E. King International Airport St. Thomas, U.S. Virgen Islands
St. Thomas Airport was a remodeling and upgrade of the existing terminal. Scope of services included the preparation of reports for value engineering and constructability analysis. V2E Global led the team for the Life Cycle analysis of mechanical, electrical, plumbing, and fire protection systems of the facility to evaluate best cost/benefit for systems to be…
Read MorePanama Metro Line 2 Panama City, Panama
Panama Metro Line 2 was a design-build of an approximately 21 km elevated metro line in Panama City. This included 16 stations, yards and shops for maintenance of the trains, and a redundant control and command center. The scope of services included project management, and design of HVAC, plumbing and fire protection.
Read More