Miami International Airport, Re-Roofing Miami, Florida

The MIA Re-roofing project consisted of the relocation and replacement of a 400,000 square foot roof for Central Terminal.  The scope of work included the engineering design, evaluation, relocation, and replacement for the mechanical, plumbing and fire protection systems. The project also included coordination with architectural, structural, and electrical engineering disciplines.

Posted in

V2E Global